Inserting a Light Fixture Schedule

This section teaches you how to insert and modify a light fixture schedule on your drawing.

Open drawing e-site in the 10 Inserting Light Fixture Schedule folder, or continue to use the drawing you were working on in the last tutorial section.

1.Run the Insert Light Fixture Project Schedule command. The Insert Light Fixture Project Schedule dialog box will open.

Ribbon: DM Photometrics->Schedule-> dm_photo-ltg-insertSchedule Insert Light Fixture Project Schedule

Pulldown Menu: DM Photometrics->Insert Light Fixture Project Schedule

2.Make sure Zoom to Schedule After Insertion is not set.

insert-light-fixture-project-schedule-dialog-box

3.Press the OK button.
4.You will be prompted to specify the insertion point for the light fixture schedule. Choose a point below the calculation area schedule as shown below.

lf-project-sch

The schedule can be customized to display the information you need:

1.Run the Insert Light Fixture Project Schedule command. The Insert Light Fixture Project Schedule dialog box will open.

Ribbon: DM Photometrics->Schedule-> dm_photo-ltg-insertSchedule Insert Light Fixture Project Schedule

Pulldown Menu: DM Photometrics->Insert Light Fixture Project Schedule

2.Press the Edit Title, Column Labels, and Column Order button. The Light Fixture Schedule Label Display and Order dialog box will open.
3.Uncheck the boxes in the Display column for the Note 2, Note 3, and Quantity rows.
4.In the Note 1 row, change the Label column value to NOTE.
5.Select the Volts row and press Move Up until it is below the Symbol row.

light-fixture-schedule-display-and-order-dialog-box

6.Press the OK button.
7.Press the OK button again in the Insert Light Fixture Project Schedule dialog box.

The light fixture schedule on the drawing will update with the customized columns and labels.


Page url: http://www.designmasterphotometrics.com/tutorial/index.html?inserting_light_fixture_schedule.htm
© 2019 Design Master Software